1. Park the vehicle at the construction location (in a relatively horizontal area, the slope is too large to affect suction);
2. Place warning tapes and construction prompt signs;
3. Connect to power supply and water source;
4. Turn on the switch of the water pump to blend the medicine; the concentration of the medicine is tested with fingers to be sticky and filamentous;
5. Connect the suction pipe and drain pipe and open the manhole cover to dilute the septic tank;
6. Start to suck feces;
7. Turn on the dosing pump switch;
8. Turn on the switch of the flocculation machine (see if the manure water is separated);
9. Put manure into the warehouse;
10. To see how much the dregs flow out of the flocculant silo, turn on the dehydrator switch to remove the dregs.