Case study ChemicalWastewater
Start Up July2014
Capacity 28,800m3/d
Location ShandongChina
Challenge
The design capacity of the WWTP is 1,200,m3/h,below data shows the influent and effluent parameters of the plan 设计规模为 1,200,m3/h, 污水厂进出水指标如下:
Project | Unit | Influent | Effluent |
COD | mg/L | 1,200 | 60 |
BOD | mg/L | 400 | 10 |
Cl- | mg/L | 16,500 | - |
Ca2+ | mg/L | 6,000 | - |
Solution
The post MBBR process, for further degradation of refractory organic matters.
后置 MBBR 工艺,用于难降解有机物的进一步生物处理。
Results
The MBBR Influent COD 80~100mg/l, Effluent COD 50~60mg/l, remove rate is more than 30%. MBBR 进水 COD 值 80~100mg/l,出水 COD 50~60mg/l,去除率高达 30%以上。