Chemical Wastewater-Shandong China

Case study     ChemicalWastewater
Start Up       July2014
Capacity       28,800m3/d
Location       ShandongChina

Challenge
The design capacity of the WWTP is 1,200,m3/h,below data shows the influent and effluent parameters of the plan 设计规模为 1,200,m3/h, 污水厂进出水指标如下:

Project

Unit

Influent

Effluent

COD

mg/L

1,200

60

BOD

mg/L

400

10

Cl-

mg/L

16,500

-

Ca2+

mg/L

6,000

-

Solution

The post MBBR process, for further degradation of refractory organic matters.

后置 MBBR 工艺,用于难降解有机物的进一步生物处理。

图片.png

Results

The MBBR Influent COD 80~100mg/l, Effluent COD 50~60mg/l, remove rate is more than 30%. MBBR 进水 COD 值 80~100mg/l出水 COD 50~60mg/l,去除率高达 30%以




NORSEN, is a worldwide leading company in wastewater & solid-liquid separation of industrial & municipal wastewater.Please feel free to contact us and our professional team will get back to you in 24 hours.
 

CONTACT US

Phone: +86 138 1256 5699

Email: jenny@norsenep.com;sales@norsenep.com

Add: Union Building 11 floor, 8th industrial street, Wuxi, Jiangsu, China

Add: Xibei H-Tech Park Wuxi Jiangsu China